top of page

Step 9

Send Final model to office.

OBJECTIVE: To allow the Quality control team a chance to review the progress made and assist you in ensuring you attain 100% accuracy.

File Transfer Form

FILE TRANSFER FORM

9.1

REMOVE ALL REFERENCE & UNUSED OBJECTS

​

Remove all unnecessary objects, files etc. from the model.

9.2

SAVE SCREENSHOTS OF ELEVATIONS

​

Use the Snip tool (or suitable alternative) to save screenshots from each elevation view (that is to be seen in final product) with overlays of provided drawings (Elevations, sections etc.)

 

9.3

SAVE SCREENSHOTS FROM CORNERS

​

​

​

​

9.4

SEND MODEL & SCREENSHOTS

.
bottom of page